High load and low downtimes will be most likely a challenge. Unfortunately we cannot really foreseen the amount of downtime required.These VMs are also under a fairly high load most of the time.
You mean replicating the disks to the new storage through a Veeam Replica job. Then after a failover, you want to connect the replicated disk to the old VM container? How will you transfer the VM configuration files from the source storage to the target storage?Setup Replication job, perform a planned failover, cold storage migrate the disks of the source (powered off) VM, fail back to production keeping all changes. Is this possible?